Skip to main content

May 20, 2021 (A.M.) CANAL REPAIR PROGRESS

May 20, 2021 - A.M.  Shot-creting started at 7:00 am and they will be finished today by 6:00 pm.  After curing for the required 24 hour period (approximately 6:00 pm Friday, May 21, 2021), we will turn the water back into the canal at the river.  

We would like to thank Flatline Concrete Pumping for spraying the shotcrete and Hooker Creek for the supplying the concrete.

Everyone's participation in this repair is greatly appreciated!

The image shows a construction site with freshly poured concrete forming a curved shape, while a worker finalizes the surface.
The image shows a construction site with freshly poured concrete in a sloped channel, surrounded by trees and equipment.
A worker is applying a concrete surface in a skate park or pool under construction, surrounded by trees and equipment.
If you haven't already done so, please "Sign Up For Text Alerts"  on the home page of this website.  As soon as water has been put back in the system, you will be notified by text.